Delivery instructions
1. Containing the materials above ±0.
2. Excluding the following:
(1) Materials for the pre-buried water and electricity pipeline below ±0;
(2) Exterior plinth materials, cement, sand, steel bar, stone, mortar, auxiliary materials for concrete, additive, glue for exterior and interior use and groundwork;
(3) All materials for exterior use.